Power Surveys
Tens of thousands of man hours and millions of pounds are lost in the IT industry each year as a result of restoring corrupt data, fixing spurious system failures or tracing lost network packets and yet year on year we keep doing the same old thing. Recent market research shows that 82% of system failures are directly or indirectly caused as a result of failures within your environmental fabric.

Poor quality power is one of the main reasons for intermittent and niggling IT problems. Many issues, which seem to be software or network related are down to bad power supplies.

END2END's Power Survey looks at the quality of power supporting your IT estate. It reviews all of the elements of your power, such as voltage, phase balance, electrical noise and power harmonics to assess whether a problem exists and where. The comprehensive survey includes electrical monitoring of your site over a 7 day period. This ensures a complete picture of your power infrastructure, including a view of the power loadings over the period, enabling current and potential future problems to be identified.
The Result of a Survey
The Survey provides a comprehensive report on any issues and the recommendations. The Report is delivered to you and then subsequently the findings are presented to you by an END2END Data Centre Consultant, so that you can digest the information first and then discuss fully the issues and the suggested recommendations proposed.
Contact Us or Call one of our Consultants on 0118 903 6648


Requirements Workshops 
Environmental Surveys 
Site Selection Surveys 
Power Surveys 
Structural Surveys 
Tender Preparation/Evaluation 
Installation Planning
CFD (Thermal Modelling) 
 
DATA CENTRE NEWS
END2END launch new cost-effective rack current meter 
END2END provide Remote Monitoring Service for North Lincs Council 
END2END win deal to extend ITEX Data Centre facilities 
R22 A/C Phase out -if your system runs on it - call us ! 
END2END completes build for Allport
END2END completes 2 Computer Room Projects at North Lincs Council
Monitoring the Power in your Data Centre - The first step towards measuring your PUE
Is yourData Centre based on 'Best Practices'? - Check here!
Company Overview
Best Practices Summary
Recruitment Vacancies 
Useful Links 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Tender Preparation 
Energy Efficiency Services 
CFD (Thermal Modelling) Services 
Data Centre Construction
Data Centre Cooling
Data Cabling Installation 
Data Centre Power Monitoring 
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Electrical Distribution Board Meters 
Water Leak Detection Systems
Rack PDU's 
Rack Meters 
IT Racks and Cabinets
Fire Systems 
Security Systems
Case Studies Overview
Thames Valley Police 
Allport 
North Lincolnshire Council 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
ITEX Group 
Nielsen Media 
UTC (Kidde)
Purple Parking
SG Hambros 
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Data Centre Life Cycle
Data Centre Components
Library and Downloads 
Other Technology Rooms 
learning zone overview
room information
component technical
library