i-ntarsia managed site
Installation Planning
How often do you find yourself in the position of having to install new IT technology in your computer room at short notice, only to discover that there doesn’t appear to be enough space in the room or racks, you don't know if you have enough spare network capacity, you don’t know the power or cooling requirements or if the increase will stop the air conditioning or trip the electrical breakers. And, of course, the business needs it all done in the next few weeks. It's a testing time.
The final documentation provided is a complete installation blueprint. The first thing that the rest of the business will know is when you report that all work is complete. END2END's Installation Planning Service is designed to take away the pain by helping you to evaluate your current computer room layout and structure against your new hardware definition. It creates:

A detailed, yet effective installation plan covering:
Physical location and new layout (CAD drawings)
Internal Rack Configurations Electrical alterations (e.g. UPS, sockets) required
A/C modifications required
Additional network data points required
A Transition plan - to deliver, install and bring new equipment on-line, whilst protecting the availability of your current IT Project

Contact Us or Call one of our Consultants on 0118 903 6648


Requirements Workshops 
Environmental Surveys 
Site Selection Surveys 
Power Surveys 
Structural Surveys 
Installation Planning
 
DATA CENTRE NEWS
END2END launch Praetorian - The complete Data Centre monitoring and management package
Is your Data Centre based on 'Best Practices'? - Check here!
Energy - are you wasting money and power? It can be fixed...click here
END2END partner with ServerTech to deliver SMART power to the Rack
Company Overview
Best Practices Summary
Recruitment Vacancies 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Data Centre Cooling
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Rack PDU's 
Rack Power Meters 
Racks (for IT equipment) 
Security Systems
Case Studies Overview
Thames Valley Police 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
UTC (Kidde)
Purple Parking
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Room Zone
Component Zone
Library Zone
learning zone overview
room information
component technical
library