© END2END Services Ltd
Terms & Conditions
Privacy Policy
 
i-ntarsia managed site
Data Centre Power
Multiple components are required within today’s modern Data Centre electrical infrastructure to ensure good quality power is delivered to the mission critical IT equipment and that the infrastructure can be resilient against possible failures. These components include but are not limited to: switchgear and distribution systems, Uninterruptible Power Supplies (UPS), Generators & Power Factor Correction equipment.

Choosing the Right Components
All of the above components need to be designed/selected correctly to ensure they are the correct capacity (not under or oversized) and work in harmony with each other. Also, in today’s social climate, company’s are being pressured by the government to be aware of their corporate social responsibility to ensure efficient use of their electrical supply:

Switchgear & Cabling Distribution Systems – should provide a resilient redundant path to ensure IT racks maintain power during a failure scenario or to complete required electrical testing
UPS’s – Provide conditioned power to sensitive mission critical IT systems during both mains present and ultimately mains loss scenario’s. Can be standalone, paralleled or modular systems
Generators – commonly diesel powered, other fuel types are available, provide a secondary power source to the IT facility (can be entire building also) in the event of a mains power failure scenario. Works in conjunction with the UPS.
Power Factor CorrectionIncreases the availability of “actual power” to a building/data centre increasing both capacity and efficiency and reduces increasing electricity costs/penalties introduced by the utility providers
Contact Us or Call one of our Consultants on 0118 903 6648


Data Centre Construction
Data Centre Cooling
Data Cabling 
Data Centre Power 
Managing Energy Use 
Enviromental Monitoring Systems
Uninterruptible Power Supplies
Power Monitoring Equipment 
Generators 
KVM (Remote IT Management) 
IT Racks and Cabinets
Rack PDUs 
Water Leak Detection Systems 
Fire Systems
Security Systems
 
DATA CENTRE NEWS
END2END launch new cost-effective rack current meter 
END2END provide Remote Monitoring Service for North Lincs Council 
END2END win deal to extend ITEX Data Centre facilities 
R22 A/C Phase out -if your system runs on it - call us ! 
END2END completes build for Allport
END2END completes 2 Computer Room Projects at North Lincs Council
Monitoring the Power in your Data Centre - The first step towards measuring your PUE
Is yourData Centre based on 'Best Practices'? - Check here!
Company Overview
Best Practices Summary
Recruitment Vacancies 
Useful Links 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Tender Preparation 
Energy Efficiency Services 
CFD (Thermal Modelling) Services 
Data Centre Construction
Data Centre Cooling
Data Cabling Installation 
Data Centre Power Monitoring 
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Electrical Distribution Board Meters 
Water Leak Detection Systems
Rack PDU's 
Rack Meters 
IT Racks and Cabinets
Fire Systems 
Security Systems
Case Studies Overview
Thames Valley Police 
Allport 
North Lincolnshire Council 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
ITEX Group 
Nielsen Media 
UTC (Kidde)
Purple Parking
SG Hambros 
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Data Centre Life Cycle
Data Centre Components
Library and Downloads 
Other Technology Rooms 
learning zone overview
room information
component technical
library