END2END survey many Data Centres and Computers Rooms over the year and many are having issues with cooling effectively. Often the main problems are simply fixed by two simple but effective products.

Firstly, many air grille tiles are just not up to the job. Often they are standard tiles with holes drilled in them - these just don't allow enough air flow. Secondly, the cool air is reaching the racks but spaces in the rack mean that much is wasted and often hot air from the rear recirculates to the front.
So what's the Answer?
Replacement of inefficient tiles with proper metal air grille tiles will ensure that the appropriate quantity of cool air reaches the racks (assuming the tiles are positioned correctly at the front of the IT racks). Click here for Datasheet.

Covering the spaces in the IT Racks with blanking plates will ensure that 100% of the cool air that reaches the rack will be targeted on the IT systems and not lost through the rack. Click here for Datasheet.
Whatever you need- you'll find it here!
We have all of the solutions, services and products that you'll ever need for your Data Centre / Computer Room. We also believe that informed customers make better decisions and it is one of our goals to provide straightforward information that helps in this process. It's this approach that has earned us our reputation for excellence. If you have a need or want to know more, use our Learning Zone to find out.

Contact Us or Call one of our Consultants on 0118 903 6648

Data Centre Construction
Data Centre Cooling
Data Cabling 
Data Centre Power 
Managing Energy Use 
Enviromental Monitoring Systems
Uninterruptible Power Supplies
Power Monitoring Equipment 
Generators 
KVM (Remote IT Management) 
IT Racks and Cabinets
Rack PDUs 
Water Leak Detection Systems 
Fire Systems
Security Systems
 
DATA CENTRE NEWS
Cooling in Computer Rooms - Whitepaper
IT Relocation - A New Service moving servers from one Data Centre to another
Simple items to improve your cooling efficiency
END2END launch new cost-effective rack current meter 
Monitoring the Power in your Data Centre - The first step towards measuring your PUE
Data Centre Best Practices Whitepaper
Company Overview
Best Practices Summary
Recruitment Vacancies 
Useful Links 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Computer Room Cleaning
IT Relocation/Migration
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Tender Preparation 
Energy Efficiency Services 
CFD (Thermal Modelling) Services 
Data Centre Construction
Data Centre Cooling
Data Cabling Installation 
Data Centre Power Monitoring 
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Electrical Distribution Board Meters 
Water Leak Detection Systems
Rack PDU's 
Rack Meters 
IT Racks and Cabinets
Fire Systems 
Security Systems
Case Studies Overview
Thames Valley Police 
Civil Nuclear Constabulary
Allport 
North Lincolnshire Council 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
ITEX Group 
ITEX Offshore 
Nielsen Media 
UTC (Kidde)
Purple Parking
SG Hambros 
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Data Centre Life Cycle
Data Centre Components
Library and Downloads 
Other Technology Rooms 
learning zone overview
room information
component technical
library