© END2END Services Ltd
Terms & Conditions
Privacy Policy
 
i-ntarsia managed site
Data Centres/Computer Rooms - Consultancy
END2END's Consultancy Services are designed to fit the problems and challenges that you will face with your Data Centres and Computer Rooms.
Environmental Surveys
Computer Rooms evolve over time and often as they grow the infrastructure (e.g. Power, Cooling, housing, etc.) fails to keep pace. END2END's Environmental Surveys look at all aspects of an existing facility and provides a report detailing all those issues and how they can be fixed.
Requirements Workshops
Before starting a new Data Centre / Computer Room project, it is essential that you create a Requirements Specification Document. This is invaluable to the creation of a good design and can also form the core of any Tender Documentation. The Workshop explains key knowledge required by Data Centre owners, extracts information about your requirements and defines jointly with you an outline of the new facility.

Site Selection Surveys
If you need a new Computer Room, actually assessing a site to see if it is suitable is a difficult process. Does the Building have enough power and usable space; is it secure enough; are access routes acceptable ;etc. END2END's Site Selection Survey reviews the entire location and gives you peace of mind that a site can be utilised.

And many more!
There are many more Consultancy packages that we offer - see the 'Key Consultancy Info' for full details.
Contact Us or Call one of our Consultants on 0118 903 6648



Requirements Workshops 
Environmental Surveys 
Site Selection Surveys 
Power Surveys 
Structural Surveys 
Tender Preparation/Evaluation 
Installation Planning
CFD (Thermal Modelling) 
 
DATA CENTRE NEWS
END2END launch new cost-effective rack current meter 
END2END provide Remote Monitoring Service for North Lincs Council 
END2END win deal to extend ITEX Data Centre facilities 
R22 A/C Phase out -if your system runs on it - call us ! 
END2END completes build for Allport
END2END completes 2 Computer Room Projects at North Lincs Council
Monitoring the Power in your Data Centre - The first step towards measuring your PUE
Is yourData Centre based on 'Best Practices'? - Check here!
Company Overview
Best Practices Summary
Recruitment Vacancies 
Useful Links 
The Data Centre Life Cycle
Methodology
Technology Room Overview
Data Centres/Computer Rooms
Call Centres
Operations Centres
Audio Visual Suites
Design and Build
Requirements Workshops
Environmental Surveys
Site Selection Surveys 
Support and Maintenance Services
Tender Preparation 
Energy Efficiency Services 
CFD (Thermal Modelling) Services 
Data Centre Construction
Data Centre Cooling
Data Cabling Installation 
Data Centre Power Monitoring 
Data Centre Power 
Managing Energy -Power Factor Correction 
Environmental Monitoring Systems
UPS's
Generators
KVM Switches (Remote IT Management)
Electrical Distribution Board Meters 
Water Leak Detection Systems
Rack PDU's 
Rack Meters 
IT Racks and Cabinets
Fire Systems 
Security Systems
Case Studies Overview
Thames Valley Police 
Allport 
North Lincolnshire Council 
Business Services Centre (NHS)
EAGA Partnership
Homegroup Ltd
ITEX Group 
Nielsen Media 
UTC (Kidde)
Purple Parking
SG Hambros 
Walsall Housing Group1
Walsall Housing Group2
Learning Zone Overview
Data Centre Life Cycle
Data Centre Components
Library and Downloads 
Other Technology Rooms 
learning zone overview
room information
component technical
library